At present, the calendering cast basalt plate has been widely used by the cast basalt plate manufacturers, but the cast basalt plate manufacturers need to pay attention to a lot of details in the construction, because only in this way can the effect be better in use. What details do we need to pay attention to? The following basalt slab manufacturers will briefly introduce their relevant knowledge points to you.
1. The construction of calendered cast basalt slab can be carried out by staggered mortar squeezing method and dry masonry method.
2. The construction shall be flat, and there shall be no boss facing the movement direction of materials between adjacent lining plates.
3. When the plate size at the corner edge of lining equipment is not enough, the plate shall be processed on site according to the actual size.
4. If Bolt fixation is required: the steel silo can be welded at one end, and the concrete silo can be fixed with expansion bolts.
5. The construction surface of the pressed cast basalt slab shall be plastered, the middle shall be slightly higher, and the plastering around the slab surface shall not be carried out.