Welcome to the official website of Penglai Shuicheng cast basalt pipeline valve Co., Ltd!

CN | EN

Focus on high-quality wear-resistant materials

  • direct supply
  • Efficient production
  • customization

Service hotline:

+86 13905455026

铸石管

Valve series
Your current location: Home >> Products >> Valve series

Contact UsContact Us

Penglai Shuicheng cast basalt pipeline valve Co., Ltd

Landline: +86 0535-5632189 / 5666528

                +86 0535-5637763

Tel: +86 137-0535-7830

Fax: +86 0535-5666528 / 5642975

Website: www.plsczsgdfm.com

Email: z.Minhui@plsczsgdfm.com

Address: No. 6, Zhenxing Road, Liujiagou Industrial Park, Penglai City, Shandong Province


Wear resistant retractor

2021-09-27 09:51:32
times
Wear resistant retractor
Details:

Purpose and specification:

Nssj series wear-resistant retractor has novel style and compact structure, and can adapt to the axial displacement of pipes at both ends. It has the characteristics of compensation, high withstand voltage, various connection modes, reliable use, simple installation and convenient maintenance.



Wear resistant retractor

Technical specifications and parameters:

Nominal diameter
(DN)
Expansion amount
(△)
Smaller length
(Lmin)
Greater length
(Lmax)
Installation length
(L)
Nominal diameter
(DN)
Expansion amount
(△)
Smaller length
(Lmin)
Greater length
(Lmax)
Installation length
(L)
40
100330430
380400100
380480
430
50
400330
430380
450
100390490440
65
100
340440390
500100390490440
80100340440390600100400
500450
100
100350
450400700
100400
500450
125
100350
450400800100420520470
150100360
460410900100420
520470
200
1003604604101000100440
540490
250
1003704704201200100440540490
300
100
3704704201400100460560510
350
100380
4804301600
100460560510

Note:

1. Pressure: 0.25 - 10.0MPa connection mode: flange (according to gb9112-9131) or welding.

2. The expansion clearance and installation length can be made according to the user's requirements.



Installation precautions:

1. Before installation, loosen the gland bolts, pull the wear-resistant retractor to the installation length (see the table above), and then tighten the bolts diagonally without bias.

2. The expander shall be installed between two fixed supports on the straight section of the pipeline. In order to ensure the normal expansion of the expander and prevent pulling off, guide supports and stops shall be set.



Recent browse:

contact us

  • Tel:+86 0535-5632189 / 5666528 / 5637763
  • Fax:+86 0535-5666528 / 5642975
  • Address: No. 6, Zhenxing, Liujiagou Town, Penglai District, Yantai City, Shandong Province
  • Email:z.minhui@plsczsgdfm.com

Leaving a message